Independent report on compliance with control and protection requirements and their performance during the electrical blackout of 28 April 2025

L. Sigrist

September 2025 - March 2026

Funding entity I-DE Redes Eléctricas Inteligentes, S.A.U


The objective of this project is to prepare an independent report on the performance of control and protection systems, and on their compliance with grid code requirements, during the moments preceding the nationwide power outage ("cero eléctrico") of 28 April 2025.


iDE_InformeApagon_2026